How to run bid gate approvals in HubSpot
If a bid landed on your desk today, could you see who needs to sign it off, and how long it's been waiting?
For a lot of construction and engineering firms, the honest answer is no. Bids get priced in one place, approved over email in another, and HubSpot ends up holding a half-updated copy of both.
The good news? HubSpot can run the whole thing, and once it's set up properly, nobody has to chase anyone.
In short: turn each bid gate into a deal stage, make each stage ask for the information it needs, and let workflows send sign-off to the right approvers based on value, deal type and business unit. Then add reminders and a dashboard, so nothing sits waiting without anyone noticing.
We've built this for construction and engineering firms with several business units and dozens of approvers. Here's how we go about it, and where it usually goes wrong.
Start with the delegation matrix, not HubSpot
Before you build anything, agree who approves what. That means writing down, for each gate, which roles sign off at which value thresholds, for which deal types and for which parts of the business.
In our experience, this is the slowest part of the whole project, and it has nothing to do with HubSpot. If the matrix isn't settled, every workflow you build will need rebuilding later.
Map your gates to deal stages
Most firms we work with use four or five gates. Yours will have different names, but the pattern tends to look something like this.
Typical bid gates in HubSpot
Gate |
The question it answers |
What's needed before it moves on |
Typical approvers |
Gate 1: Bid or no bid |
Should we go for this at all? |
Client, scope, rough value, fit with strategy |
Business unit lead |
Gate 2: Bid approval |
Are we happy with what we're about to submit? |
Bid model link, pricing, risk register, enquiry folder |
Commercial and technical leads |
Gate 3: Contract approval |
Are we happy to commit to these terms? |
Final price, margin, contract terms, compliance checks |
Directors, depending on value |
Gate 4: Handover |
Is delivery ready to pick this up? |
Project lead, start date, project length, key documents |
Operations or delivery lead |
Make each gate ask for what it needs
Set required fields on each deal stage, so a deal can't move to the next gate without them. Links to the bid model and the enquiry folder are the ones teams forget most often.
Keep the list short, though. If a stage asks for 20 fields, people will type anything into them just to get past. A short list that gets filled in properly beats a long one that doesn't.
Let approvals route themselves
This is where most of the build time goes.
- Work out an approval level for each deal, based on its value and deal type.
- Build a workflow that branches by approval level and business unit, then creates a task for each approver.
- Store the approvers on the deal record itself, filled in by the workflow. That way, someone can swap in a cover approver for holidays or leave without anyone touching the workflow.
- Lock the approval level once approval has started, so nobody can change the deal value halfway through to dodge a sign-off.
- When everyone has approved, move the deal on and let the deal owner know. If someone says no, send it back with their reason.
Make waiting visible
Approvals stall when nobody can see them. We usually add three things:
- A card on the deal record showing who has approved and who hasn't
- A reminder when a task has been waiting too long, plus a weekly round-up for each approver
- A dashboard showing deals awaiting approval by gate, how long they've been waiting, and anything that wasn't approved
Not sure what your HubSpot setup is holding back?
Our free HubSpot health check takes a few minutes and shows where your setup is getting in the way, from pipelines and approvals to reporting.
Test it properly before you switch it on
Create test deals for every combination of deal type, value band and business unit, with notifications muted. For one client, that meant more than 20 scenarios.
It's tedious, but it's far less painful than a director getting 40 emails on day one.
Train people before go-live
Approvers need to know what a notification means and what to do with it. We use short sessions with practice deals, plus a two-minute video people can come back to.
The biggest factor in adoption isn't the build, though. It's whether someone senior keeps asking "what's waiting for approval?" and expects the answer to come from HubSpot.
Common mistakes we see
- Building workflows before the delegation matrix is agreed
- Typing approvers' names into workflows, so every leaver breaks something
- Letting deal values change mid-approval
- Sending every notification to everyone
- Launching without a dashboard, so nobody can see the bottlenecks
A few questions we often get asked
Which HubSpot plan do I need for bid approvals?
In practice, Professional or above, because the approval routing runs on workflows. It's worth checking your own subscription before you plan the build.
Can HubSpot replace our bid management software?
Not usually. HubSpot is great at tracking the commercial journey and approvals. Specialist estimating and document tools still do their own jobs, and we link to them from the deal.
How long does it take to set up?
The build is often the quick part. Agreeing the delegation matrix and getting people trained is what takes the time.
Over to you
So, back to that bid on your desk. Could you see who needs to sign it off, and how long it's been sitting there? If the honest answer is a pause, it's probably worth a closer look.
At Disruptive Thinking, we help construction, engineering and property firms run bids, approvals and handover in HubSpot, so the process lives in the system rather than in someone's inbox.
If you'd like a second pair of eyes on your setup, take our free HubSpot health check or book a free 30-minute consultation. No obligation, just a sensible conversation about what your business actually needs.